United Kingdom

FaMe revised the CAD interface completely, the new CAD versions require a redesign. The new FaMe CAD interface is in the delivery status and is based on the new opportunities of the CAD versions. Acitv-X components are not necessary like before, also the security settings of internet browser are automatically considered now. The interface is designed, that the FaMe viewer and the FaMe Building Management interface (BMS) are operated as well. A core function is still the connection between CAD and the FaMe system. The BMS version is worked with the building model, it means, that changes which are made at the workplace are connected to another building model and are assigned to the workplace. The second operator can see the changes ONLINE.